Assured Excavating’s storm drainage experience includes the installation of round pipe, elliptical pipe and box culverts in a variety of projects and improvements. We have installed pipe of many different materials including precast concrete, plastic and corrugated metal in a varied collection of sites and conditions.
Installation of storm drainage systems includes safely excavating the appropriate trenches per OSHA and/or EM-385 standards, depending on client and site jurisdiction. Excavation benching, trench boxes and/or shoring are employed, as necessary, to ensure compliance and safety for workers inside and around the excavation. Bedding and backfill materials are placed per material requirements, density controlled and moisture controlled, as required by plans and specifications. Pipe is installed with proper joints and on designed grade.
Storm drainage systems are vital to the performance of new subdivisions, roadways, parking lots and commercial developments. Quality installation is key, as leaks or other failures may cause flooding, pavement damage or safety concerns.